Friday, June 29, 2012
Septic System Project
6:51 AM
You might have noticed on a recent round at Richter all the construction going on between 17 Green and 18 Fairway. This is the installation of the new septic system. We have had ongoing problems with the old system for several seasons now and after meeting with city officials and engineers it was decided upon that a long term repair was required to minimize long term problems down the road.
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment