Friday, June 29, 2012

Septic System Project

You might have noticed on a recent round at Richter all the construction going on between 17 Green and 18 Fairway.  This is the installation of the new septic system.  We have had ongoing problems with the old system for several seasons now and after meeting with city officials and engineers it was decided upon that a long term repair was required to minimize long term problems down the road.

This project was broken down into two separate projects.   The 1st is the installation of a new system behind the Richter House.  The 2nd  phase is repairing the existing system on #1.  This will allow us ample room for development and ensure that we stay operating for years to come.